In-park information screens
PortAventura Park showed waiting times on LED boards and listed closed rides on strips an operator changed by hand. I designed the digital screens that replaced them, themed for every area of the park, and I still own them.

PortAventura World
- Client
- PortAventura World
- Role
- Product designer, project owner
- Team
- Design lead, e-commerce stakeholder, external development team
- Period
- October 2023 – present
- Reading time
- 8 min
- The problem
- Waiting times lived on fixed LED boards that only listed the big rides, and closed rides were posted by hand every morning. Smaller rides had no queue because nobody knew they were there.
- What I did
- I ran the research in the park (observation, interviews with guests, sessions with operators and a benchmark of other parks) and designed every screen family, from 24-inch ride entrances to 75-inch area totems.
- The outcome
- Themed screens across the park that show every ride with a queue, in four languages. The project led to my hire, and I've owned and improved the screens since, down to the code.
PortAventura Park is split into themed areas, and each one tells its own story: a Chinese empire, the Far West, a Mediterranean fishing village. I designed the digital screens that tell guests what’s happening in each of them: how long the queues are, which show is on next and where to eat nearby. It was my first project at PortAventura. I ran the research and designed every screen family, and they’ve been mine ever since, down to the code.
The resort reports more than five million visitors a year, and on a summer day the park holds tens of thousands of them at once. Most of them look at one of these screens before deciding where to walk next, so a layout that fails in the sun, or a queue time nobody trusts, is not a small mistake.
The problem
Before these screens, the park showed waiting times on LED boards next to the big rides. They listed a fixed set of mostly major attractions, with the time in hours and minutes. Closed rides were posted on a separate board, as name strips that an operator changed by hand every morning.


On busy days the queues built up on the major rides while the smaller ones stayed quiet. When we asked why, the answer was simple: guests didn’t know those rides existed, where they were, or whether they were worth the walk. PortAventura measures the waiting time of almost every ride that can have a queue, and the boards showed only a handful of them.
Research in the park
Research and design ran from October 2023 to January 2024, with the design lead of the digital team beside me and a stakeholder from the e-commerce team commissioning and approving the work.
We spent many days in the park. We watched how guests read the old boards and planned their next move, ran short interviews and surveys on the spot, and held sessions with the ride operators, who knew the day-to-day problems best: keeping waiting times in sync, a ride going into maintenance mid-morning, another one closed for the whole day. Each of those became a screen state later.
I also benchmarked about twenty screens from other parks, including Europa-Park, Parc Astérix and Walt Disney World. Most of them used a large picture per ride and gave little room to the smaller attractions or their waiting times, which is exactly the problem we were trying to solve.

I reviewed each wireframe version with the stakeholders and noted what it tried, what they approved and what was still open. Then I tested them on provisional screens in the park, because the final hardware wasn’t installed yet.

Constraints
The screens had to work in four languages at once (Spanish, Catalan, English and French), because a screen can’t know who’s standing in front of it. They came in three formats: 24-inch screens at ride entrances, 75-inch vertical totems in each area and 75-inch horizontal screens for the whole park. Every area has its own theme, and the park cares a lot about keeping it, so the screens had to look like part of Far West or China while staying readable from a distance, in daylight, in a few seconds. And the data was live: a ride could go from open to a technical stop in the middle of the morning, and the screen had to catch up within minutes.
Decisions
Organise each screen around the area you’re standing in
Watching people in the park changed the plan more than anything else. Guests discover the park area by area. They spend the morning in Mediterrània or Far West, find out what’s on around them, and rarely cross from one end of the park to the other.
So I designed two views for the vertical totems. Focus shows only the area you’re in: its rides, its next shows and the restaurants nearby, with the walking time and direction to each one. Global shows the waiting times for the whole park, grouped by area, with a “You are here” marker. Once we saw how people moved, the restaurant and show sections became far more important than we’d first thought.



Show every ride at the same level
My first designs followed the benchmark and showed only the major rides, with the idea of giving each one a picture, as other parks do.



The research pointed the other way. The smaller rides interested plenty of guests, and they only stayed empty because nobody could see them. The stakeholders pushed for the same thing, even more than the guests did. I gave up the big pictures and put major and secondary rides in one list, at the same level, so the offer looks bigger and a 10-minute ride is as visible as a 90-minute one.
Theme the titles, keep the data plain
Each area has its own display typeface, from the brush strokes of China to the wanted-poster letters of Far West, plus its own background and artwork. I kept those for titles only. Ride names, waiting times and every detail use Gilroy, a very legible sans serif that already belongs to the PortAventura brand.
That split let each screen belong to its area while the information stayed readable from across a path. It also gave development a clear rule: one theme file per area, the same layout underneath. And the place decided the rest: we studied where each screen would stand and what surrounded it, and that fixed the type scale, whether it could play video and how many shows fit on it. The one at the park entrance is read from far away, so nothing on it is small.




Say “temporarily”, and say when it opens
A ride that stops is bad news, and the operators and stakeholders wanted it handled carefully. I wrote the states to sound temporary and to look ahead. A weather stop and a technical stop share one line in the lists, and only the icon tells them apart; the ride’s own screen names the reason. Only a ride closed for the whole day gets the alert colour.
| What happened | What the screen says | Colour |
|---|---|---|
| Not open yet, opening time known | Opens at 11:00 | Blue |
| An operator marks it as about to open | Opens soon | Green |
| Stopped for the weather | Temporarily closed, with a weather icon | Yellow |
| Stopped for a technical check | Temporarily closed, with a technical icon | Yellow |
| Closed for the day | Closed | Alert orange |

Result
The screens went live in 2024 across PortAventura Park: ride entrances, area totems and park-wide screens, each one themed for its area and showing every ride that has a queue, updated live from the park’s systems.
The project also changed my own story. I designed it under a fixed engagement that ended at handoff, and it’s the reason PortAventura hired me in May 2024. Since then the family has grown: in 2025 I designed the park entrance screens, with ticket prices and Express passes for the three parks, and the hotel screens, with the day’s opening hours, rides closed today and the weather by the hour.






What the park taught the code
Later research changed the time format, from hours and minutes to plain minutes. In April 2026 I went further and coded a round of improvements myself, from what I’d seen standing in front of the screens. Some of it is visible: new icons, an alert colour for closed rides, layouts tuned for the real panels. The rest is the kind of detail nobody notices when it works.
- The players run an old build of Chromium, years behind the browser on my laptop. Anything newer than it simply doesn’t render, and nothing warns you, because the page still looks perfect on the machine you designed it on. Modern spacing had to be rewritten in a way it understands.
- The park’s Wi-Fi is slow, so the loading state waits a second before it appears. A fast refresh never flashes.
- Waiting times refresh every two minutes without touching the loader, so the screen never blinks while people are reading it.
- SésamoAventura’s display typeface has no digits, and the opening hours were being cut off. In that area alone, numbers fall back to Gilroy.
- Show cards are capped at three sessions and two title lines, so a long show name can never push the next ride off the screen.


Of everything I’ve designed at PortAventura, this is the project I feel most mine: I was there before the first wireframe, and I’m still the one who goes down to the park to see how the screens are doing.
What I’d do differently
I’d make design QA part of the contract. My engagement ended at handoff, so no designer stayed with the build. The animations, the type scale and a few layouts drifted in development, and some of that debt was still there when I came back.
I’d test on the real screen, in its real place, before launch. Installation dates meant we only ever tested on provisional screens that looked like the final ones, and the code went straight to production. Some of the scaling problems only showed up once the real screens were in the park.
And I’d ask for the device specs before designing any motion. Nobody told us the players ran an old Chromium that couldn’t do modern animation, so we designed a motion package the hardware could never play, and only half of it was ever built. Fixing it was one of the first things I did when the project became mine.
Next on my list is a screen I’ve designed but not shipped yet: on busy days, the ride screens would suggest the time of day with the shortest expected wait, to spread guests across the day as well as across the park.
5M+ visitors a year
PortAventura World's publicly reported attendance: the audience these screens are designed for.
8 area themes
Each with its own typeface, background and artwork, matched to the land it stands in.
4 languages
On every screen at the same time, with no room to grow the layout.
3 screen formats
From 24-inch panels at ride entrances to 75-inch totems.

